
East London · E3 · 2022
Bow Roofing
Category
Roofing
Area
Bow (E3)
Duration
20 weeks
Completed
2022
Overview
Full roof strip and re-covering in natural slate with new leadwork and insulation. Sample case study set in Bow (E3).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Plumbing & heating
- Tiling
- Bespoke kitchen install
- Snagging & handover
- Party wall coordination
- Steelwork
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 20 weeks
Gallery












Client feedback (illustrative)
“Budget held, drawings were followed, handover was painless.”
Illustrative feedback — E3 roof (portfolio example, not a real client review)
Project area
Approximate area only — Bow, E3. No property addresses are published.
Related projects
All projects →
TW9Roofing · 2022
Richmond Roofing
Full roof strip and re-covering in natural slate with new leadwork and insulation. Sample case study set in Richmond (TW9).
View project →
CR0Roofing · 2019
Croydon Roofing
Full roof strip and re-covering in natural slate with new leadwork and insulation. Sample case study set in Croydon (CR0).
View project →
SW3Roofing · 2025
Chelsea Roofing
Full roof strip and re-covering in natural slate with new leadwork and insulation. Sample case study set in Chelsea (SW3).
View project →