Bow Roofing completed roofing

East London · E3 · 2022

Bow Roofing

Category

Roofing

Area

Bow (E3)

Duration

20 weeks

Completed

2022

Overview

Full roof strip and re-covering in natural slate with new leadwork and insulation. Sample case study set in Bow (E3).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Plumbing & heating
  • Tiling
  • Bespoke kitchen install
  • Snagging & handover
  • Party wall coordination
  • Steelwork

Materials used

Blackened metalworkZinc standing seamNatural slateSolid ash joinery

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 20 weeks

Gallery

Bow Roofing — During construction
During construction
Bow Roofing — Roofing detail
Roofing detail
Bow Roofing — First fix underway
First fix underway
Bow Roofing — Close-up craftsmanship
Close-up craftsmanship
Bow Roofing — Living space completed
Living space completed
Bow Roofing — Kitchen detail
Kitchen detail
Bow Roofing — Bathroom finishes
Bathroom finishes
Bow Roofing — Loft level
Loft level
Bow Roofing — Exterior
Exterior
Bow Roofing — Garden
Garden
Bow Roofing — Rear elevation
Rear elevation
Bow Roofing — Completed works
Completed works

Client feedback (illustrative)

Budget held, drawings were followed, handover was painless.

Illustrative feedback — E3 roof (portfolio example, not a real client review)

Project area

Approximate area only — Bow, E3. No property addresses are published.