
South London · CR0 · 2019
Croydon Roofing
Category
Roofing
Area
Croydon (CR0)
Duration
20 weeks
Completed
2019
Overview
Full roof strip and re-covering in natural slate with new leadwork and insulation. Sample case study set in Croydon (CR0).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Plastering
- Painting & decorating
- Waste management
- Structural calculations
- Groundworks
- Roofing & leadwork
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 20 weeks
Gallery










Client feedback (illustrative)
“The team worked around us and hit every milestone on the schedule.”
Illustrative feedback — CR0 roof (portfolio example, not a real client review)
Project area
Approximate area only — Croydon, CR0. No property addresses are published.
Related projects
All projects →
TW9Roofing · 2022
Richmond Roofing
Full roof strip and re-covering in natural slate with new leadwork and insulation. Sample case study set in Richmond (TW9).
View project →
SW3Roofing · 2025
Chelsea Roofing
Full roof strip and re-covering in natural slate with new leadwork and insulation. Sample case study set in Chelsea (SW3).
View project →
E3Roofing · 2022
Bow Roofing
Full roof strip and re-covering in natural slate with new leadwork and insulation. Sample case study set in Bow (E3).
View project →