Foxter
Croydon Roofing completed roofing

South London · CR0 · 2019

Croydon Roofing

Category

Roofing

Area

Croydon (CR0)

Duration

20 weeks

Completed

2019

Overview

Full roof strip and re-covering in natural slate with new leadwork and insulation. Sample case study set in Croydon (CR0).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Plastering
  • Painting & decorating
  • Waste management
  • Structural calculations
  • Groundworks
  • Roofing & leadwork

Materials used

Porcelain large formatMarble compositeClay plasterPowder-coated steel

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 20 weeks

Gallery

Croydon Roofing — Roof detail
Roof detail
Croydon Roofing — Roofing detail
Roofing detail
Croydon Roofing — Wider context
Wider context
Croydon Roofing — Lower ground level
Lower ground level
Croydon Roofing — Leisure space
Leisure space
Croydon Roofing — Before works commenced
Before works commenced
Croydon Roofing — During construction
During construction
Croydon Roofing — First fix underway
First fix underway
Croydon Roofing — Close-up craftsmanship
Close-up craftsmanship
Croydon Roofing — Completed works
Completed works

Client feedback (illustrative)

The team worked around us and hit every milestone on the schedule.

Illustrative feedback — CR0 roof (portfolio example, not a real client review)

Project area

Approximate area only — Croydon, CR0. No property addresses are published.