Kitchen extension in London by Foxter — portfolio example

Kitchen Extensions in London

Side-return, rear and wrap-around extensions in London, designed around the kitchen and built and coordinated end to end.

Build rate

£2,700–£4,500 / m²

Kitchen supply & fit

£15,000–£70,000+ extra

Programme

12–16 weeks on site + 8–12 design

Coverage

All London boroughs

Why a kitchen extension is its own job

A London kitchen extension is two projects that have to be designed as one. There is the building work — foundations, drainage, steel over the rear opening, roof, glazing — and there is the kitchen itself, which decides where the waste, the water, the extract duct and half the electrical load need to be long before the screed goes down.

When those are contracted separately, the joints are where money and weeks disappear: an island with no waste fall, a duct run that clashes with a steel, a rooflight that lands over the tall units. Foxter carries both sides of that line, so the layout is fixed at design stage and the shell is built to suit it.

The typical London cases are a side-return infill reclaiming the dead alley beside a Victorian terrace, a single-storey rear extension opening the ground floor onto the garden, or a wrap-around doing both — usually with the existing rear wall removed on a steel goalpost so the old and new floor read as one room.

What a kitchen extension package covers

  • Measured survey, drainage investigation and feasibility advice
  • Kitchen layout design agreed before the shell is sized
  • Planning application or permitted development certificate
  • Structural calculations for the rear opening and steel goalpost
  • Party wall notices and awards with adjoining owners
  • Foundations, drainage diversion and build-over agreement
  • Brickwork, steel frame, roof, rooflights and sliding or bifold glazing
  • Kitchen first fix: island waste, appliance circuits and ducted extract
  • Insulation, underfloor heating and screed
  • Cabinetry, worktops, splashbacks, appliances and lighting
  • Decoration, external make-good and building control sign-off

How we deliver it

01

Kitchen-led design

We start from the finished layout — sink, hob, island, tall units, appliance doors, seating — then size the extension and the openings around it, rather than fitting a kitchen into whatever shell results.

02

Consents and structure

Permitted development certificate or planning application, structural engineer's calculations for the rear opening and any steel goalpost, building control, and party wall notices with adjoining owners.

03

Groundwork and drainage

Excavation, foundations, drainage diversions and a build-over agreement where the run crosses a public sewer — the part of a kitchen extension most likely to produce surprises.

04

Shell and glazing

Brickwork or blockwork, steel frame, flat or pitched roof, rooflights, sliding doors or bifolds installed to a watertight shell before internal trades start.

05

Services and screed

Kitchen first fix — waste and hot and cold to the island, dedicated appliance circuits, ducted extract to an external wall — then insulation, underfloor heating and screed.

06

Kitchen installation and handover

Cabinetry, worktops, splashbacks, appliances, lighting and decoration, followed by commissioning, building control sign-off and a documented snagging list.

Side-return, rear or wrap-around?

A side-return infill fills the narrow strip beside the rear outrigger. It rarely adds a huge floor area, but it changes the shape of the room from a corridor kitchen into a square one, which is usually what people actually want. A rear extension pushes the whole back of the house out and suits a kitchen-dining layout with doors onto the garden. A wrap-around combines both and is the option that most often needs full planning rather than permitted development.

Light, glazing and the roof

Deep plans go dark in the middle. Rooflights over the run of units, a lantern above the dining zone, and full-height glazing to the garden are the three levers, and they have to be positioned before the steel is designed. Structural glass and slim-framed sliding doors need heavier lintels and deeper upstands than standard bifolds, so the glazing choice belongs at the start of the job.

Drainage, extract and services

Islands are the usual complication: a sink or dishwasher in an island needs a waste run in the slab, so it must be set out before the screed. Extract is the other one — a recirculating hood is a compromise, and a ducted run to an external wall has to be routed around the steels. Both are resolved on drawings, not on site.

Kitchen extension costs in London

The build and the kitchen are priced separately, so you can see what the structure costs before choosing cabinetry. Figures are indicative 2026 London ranges; a written quotation follows a site visit.

Cost by extension type

TypeTypical size"Indicative range"
Side-return extension (build)15–25m²£65,000–£130,000
Rear extension (build)15–25m²£70,000–£140,000
Rear extension, all-in with mid-range kitchen15–25m²£90,000–£170,000
Wraparound extension (build)Larger or high-specification schemes can exceed this.40–60m²£130,000–£260,000

Indicative 2026 London ranges; written quotation follows a site visit.

Build rate per m²

Type"Indicative range"
Mid specification£2,700–£3,500/m²
High specification£3,500–£4,500/m²

Indicative 2026 London ranges; written quotation follows a site visit.

Kitchen supply and fit (extra)

Type"Indicative range"
Mid-range kitchen supply and fit£15,000–£40,000
Premium kitchen supply and fit£40,000–£70,000+

Indicative 2026 London ranges; written quotation follows a site visit.

Programme: typically 12–16 weeks on site, plus around 8–12 weeks of design and planning beforehand. Architect and engineer fees, party wall costs and planning fees depend on the scheme and are set out separately. For the full breakdown read our kitchen extension cost guide.

Planning routes

Permitted development

Many single-storey rear and side-return extensions to houses can proceed under permitted development, within size and height limits. A lawful development certificate confirms it before you build.

Prior approval

Larger single-storey rear extensions can use the prior approval route, where neighbours are notified and the council decides on impact.

Full planning

Wraparound extensions, double-storey schemes and anything beyond permitted development limits normally need a full planning application.

Conservation areas

In a conservation area, side extensions and some materials are restricted, and design needs to suit the street. Much of inner London is designated, so we check your address first.

Article 4 directions

Some boroughs remove permitted development rights on specific streets. Where an Article 4 direction applies, an extension that would otherwise be permitted needs planning.

Flats and maisonettes

Flats have no householder permitted development rights, so a kitchen extension to a flat needs planning permission and, usually, the freeholder's consent.

Planning a bigger change than the kitchen? See house extensions and our house extension cost guide. If the room can stay the size it is, a kitchen renovation without extending is a different, shorter project. When you are ready, get an instant estimate or book a site visit.

Kitchen extension examples

All portfolio case studies

Illustrative concept case studies — not records of specific client contracts.

Kitchen extension questions

What is a kitchen extension?

It is an extension planned around where the kitchen will end up rather than around the shell alone. In London that is usually a single-storey rear extension, a side-return infill on a Victorian terrace, or a wrap-around combining both — with the run of units, the island, the extract route and the drainage all resolved at design stage rather than at second fix.

Do I need planning permission for a kitchen extension in London?

Many single-storey rear and side-return extensions fall inside permitted development, but the limits depend on the property type, whether it has been extended before, and whether you are in a conservation area or a flat. We establish the route — permitted development certificate or full planning — before design work starts, and we make the application either way.

How much does a kitchen extension cost?

Indicative 2026 London ranges: a 15–25m² side-return build £65,000–£130,000, a 15–25m² rear build £70,000–£140,000 (£90,000–£170,000 all-in with a mid-range kitchen), and a 40–60m² wraparound build £130,000–£260,000. The build rate is £2,700–£3,500/m² mid and £3,500–£4,500/m² high specification; kitchen supply and fit is extra at £15,000–£40,000 mid or £40,000–£70,000+ premium. A written price follows a site visit.

How long does a kitchen extension take?

Typically 12–16 weeks on site, plus around 8–12 weeks beforehand for design, planning or a lawful development certificate, and party wall notices. The shell, glazing and roof come first, then services, screed, plaster and the kitchen installation.

Can we stay in the house during the works?

Most clients do. We plan a temporary kitchen position, dust-seal the working zone, agree working hours, and sequence the demolition of the existing rear wall so the house is only opened up once the new structure is ready to take it.

Who handles the kitchen itself?

We do. The same team that builds the shell installs the cabinetry, worktops, appliances, extract and lighting, so there is no gap between the builder and the kitchen supplier when a service run or a tolerance does not line up.

Ready to open up the back?

Model an indicative figure in a minute, or book a site visit and we will measure, check the drainage and put a written scope together.