Guide · Greater London · 2026
Kitchen extension cost in London
Indicative 2026 ranges for the three kitchen extensions we build most in London, what each figure covers, and what usually moves the price. A written quotation follows a site visit.
Cost by extension type
| Type | Typical size | "Indicative range" |
|---|---|---|
| Side-return extension (build) | 15–25m² | £65,000–£130,000 |
| Rear extension (build) | 15–25m² | £70,000–£140,000 |
| Rear extension, all-in with mid-range kitchen | 15–25m² | £90,000–£170,000 |
| Wraparound extension (build)Larger or high-specification schemes can exceed this. | 40–60m² | £130,000–£260,000 |
Build figures exclude the kitchen except where stated all-in. Indicative 2026 London ranges; written quotation follows a site visit.
Build rate and the kitchen
The extension is priced on its build rate, and the kitchen is priced on top. Splitting the two lets you compare quotations properly and decide on cabinetry once the structure is fixed.
Build rate per m²
| Type | "Indicative range" |
|---|---|
| Mid specification | £2,700–£3,500/m² |
| High specification | £3,500–£4,500/m² |
Indicative 2026 London ranges; written quotation follows a site visit.
Kitchen supply and fit
| Type | "Indicative range" |
|---|---|
| Mid-range kitchen supply and fit | £15,000–£40,000 |
| Premium kitchen supply and fit | £40,000–£70,000+ |
Indicative 2026 London ranges; written quotation follows a site visit.
What the build figure usually covers
Foundations and drainage, the structural opening and steelwork, walls, roof and rooflights, glazing to the garden, insulation, underfloor heating and screed, first-fix services for the kitchen, plaster and decoration of the new space, and building control sign-off.
What sits outside it: architect and structural engineer fees, party wall surveyors' fees, planning or lawful development certificate fees, any build-over agreement with the water company, and the kitchen itself. These depend on the scheme and are listed separately in a written quotation.
What usually changes the price
- Glazing: large sliders, structural glass and lanterns cost more than standard doors and rooflights.
- Ground and drains: deeper foundations near trees or on clay, and diverting a shared drain.
- Structure: a goalpost frame or removing a chimney breast adds steel and engineering.
- Access: no side access means everything comes through the house, which adds time.
- Specification: floor finish, joinery and the kitchen choice move the total most.
- Party walls: an attached house usually needs notices, and sometimes an award.
Planning and timescales
Many single-storey extensions to houses fall within permitted development, confirmed with a lawful development certificate. Conservation areas, Article 4 directions, flats and wraparound or larger schemes usually need a planning application. Allow around 8–12 weeks for design and planning, then typically 12–16 weeks on site.
Not sure whether to extend? Compare a kitchen renovation within the existing room, read about house extensions, or see the wider house extension cost guide.
Common questions
How much does a kitchen extension cost in London?
Indicative 2026 London ranges: a 15–25m² side-return build £65,000–£130,000, a 15–25m² rear build £70,000–£140,000, and a 40–60m² wraparound build £130,000–£260,000. A rear extension all-in with a mid-range kitchen is typically £90,000–£170,000. A written price follows a site visit.
Is the kitchen included in the build price?
No. The build figures cover the extension itself. Kitchen supply and fit is extra: around £15,000–£40,000 for mid-range and £40,000–£70,000+ for premium.
What is the cost per square metre?
Our indicative build rate is £2,700–£3,500 per m² at mid specification and £3,500–£4,500 per m² at high specification, with the kitchen extra.
What is not included?
Professional fees (architect, structural engineer, party wall surveyors), planning or certificate fees and any build-over agreement depend on the scheme and are set out separately in the quotation.
How long does a kitchen extension take?
Typically 12–16 weeks on site, plus around 8–12 weeks beforehand for design and planning or a lawful development certificate.
Do I need planning permission?
Many single-storey side-return and rear extensions to houses fall within permitted development, but conservation areas, Article 4 directions, flats and wraparound or larger schemes usually need an application. We confirm the route for your address first.