Kitchen Renovations in Richmond

A kitchen renovation is the highest-traffic project in a house and the one where poor sequencing shows fastest. Our kitchens are installed by the same team that carries out the enabling works — the wall removals, the new circuits, the drainage moves, the levelled floor — so nothing is fitted to a substrate that is not ready for it.

Richmond's conservation areas, riverside flood zone and mature tree cover all affect design, foundations and consents, so we survey carefully before committing to a scheme.

That context shapes how we approach kitchen renovations here. Parking suspensions and skip permits are usually straightforward, and many properties have side or rear access that speeds up muck-away and material handling. We survey the property, confirm the consents that apply to TW9 and issue a fixed price against a written scope, so the figure you sign is the figure you pay unless you change the brief.

Our indicative rate for kitchen renovations in South West London is around £1,510 per , reflecting a ×1.08 area factor against our London baseline. Use the instant quotation tool for a figure tailored to your size, specification and start date.

Included in Richmond

  • Kitchen layout design, appliance planning and 3D visuals
  • Strip-out of the existing kitchen and waste removal
  • Structural openings, steels and knock-throughs where required
  • New electrical circuits, sockets, lighting and extraction
  • Plumbing moves, waste re-routing and boiler relocation
  • Floor levelling, screeds and underfloor heating
  • Plastering, wall preparation and ceiling repairs
  • Cabinet installation, worktop templating and fitting

How the job runs

01

Design and measure

Full measured survey, appliance schedule, service positions and a layout that respects the working triangle and real circulation.

02

Enabling works

Strip-out, structural changes, drainage and any window or door alterations.

03

First fix

Electrics, plumbing, extraction ducting and underfloor heating installed and tested before anything is closed up.

04

Finishes

Plaster, floor preparation, tiling and decoration prepared to a true surface for the cabinetry.

05

Installation

Cabinets fitted and levelled, worktops templated and installed, appliances connected and commissioned.

06

Snagging

Doors and drawers aligned, silicone and trims finished, certificates issued and the space cleaned for use.

Layout before finishes

The finish choice matters far less than the plan. We start with where the sink, hob and fridge sit relative to each other, how many people use the room at once, and where daylight comes from. Islands need at least 1m of clearance all round — 1.2m if it is also a seating zone — and a run of tall units on the wrong wall will make a large kitchen feel cramped.

Extraction is the most commonly under-specified element. Ducting to an external wall always outperforms recirculation, and the duct route needs planning before the ceiling is closed up. We size the extractor to the hob and the room volume rather than to the fashionable option in the brochure.

Kitchen renovations in Richmond: common questions

How long does a kitchen renovation take?

4–6 weeks for a straightforward replacement, 8–12 weeks where walls come down, floors are relaid or the room is part of a wider ground-floor reconfiguration.

Can you install a kitchen I have bought elsewhere?

Yes. We regularly install kitchens supplied by clients from any brand, and we carry out all the enabling works, services and finishing around them.

Do I need permission to remove a kitchen wall?

If the wall is load-bearing you need building regulations approval and a structural engineer's design. In a flat you will also need freeholder consent. We arrange both.

Can I move the sink or hob?

Usually yes. Sinks need a fall on the waste run to an existing stack, and gas hobs need a Gas Safe run and correct ventilation. Induction hobs simplify the electrics and are what most of our clients now specify.