
Central London · EC2 · 2025
Bank Bathroom Renovation
Category
Bathroom Renovations
Area
Bank (EC2)
Duration
5 months
Completed
2025
Overview
A spa-style bathroom with large format porcelain, walk-in shower and underfloor heating. Sample case study set in Bank (EC2).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Plastering
- Painting & decorating
- Waste management
- Structural calculations
- Groundworks
- Roofing & leadwork
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 5 months
Gallery










Client feedback (illustrative)
“The team worked around us and hit every milestone on the schedule.”
Illustrative feedback — EC2 bathroom (portfolio example, not a real client review)
Project area
Approximate area only — Bank, EC2. No property addresses are published.
Related projects
All projects →
NW3Bathroom Renovations · 2019
Hampstead Bathroom Renovation
A spa-style bathroom with large format porcelain, walk-in shower and underfloor heating. Sample case study set in Hampstead (NW3).
View project →
E14Bathroom Renovations · 2025
Canary Wharf Bathroom Renovation
A spa-style bathroom with large format porcelain, walk-in shower and underfloor heating. Sample case study set in Canary Wharf (E14).
View project →
SW4Bathroom Renovations · 2022
Clapham Bathroom Renovation
A spa-style bathroom with large format porcelain, walk-in shower and underfloor heating. Sample case study set in Clapham (SW4).
View project →