
North London · EN5 · 2025
Barnet Driveway
Category
Driveways
Area
Barnet (EN5)
Duration
20 weeks
Completed
2025
Overview
A permeable resin-bound driveway with new drainage and front boundary works. Sample case study set in Barnet (EN5).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Carpentry & joinery
- Electrical & lighting
- Flooring
- Building control sign-off
- Design & planning support
- Demolition & strip-out
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 20 weeks
Gallery














Client feedback (illustrative)
“Clear programme, tidy site and a finish that lifted the whole house.”
Illustrative feedback — EN5 driveway (portfolio example, not a real client review)
Project area
Approximate area only — Barnet, EN5. No property addresses are published.
Related projects
All projects →
N8Driveways · 2021
Crouch End Driveway
A permeable resin-bound driveway with new drainage and front boundary works. Sample case study set in Crouch End (N8).
View project →
NW10Driveways · 2020
Willesden Driveway
A permeable resin-bound driveway with new drainage and front boundary works. Sample case study set in Willesden (NW10).
View project →
W14Driveways · 2024
Holland Park Driveway
A permeable resin-bound driveway with new drainage and front boundary works. Sample case study set in Holland Park (W14).
View project →