Central London · WC1 · 2024
Bloomsbury Basement Conversion
Category
Basement & Cellar Conversions
Area
Bloomsbury (WC1)
Duration
6 weeks
Completed
2024
Overview
A cellar dig-out and tanking scheme turning dead storage into habitable living space. Sample case study set in Bloomsbury (WC1).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Flooring
- Building control sign-off
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
- Electrical & lighting
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 6 weeks
Gallery














Client feedback (illustrative)
“Clear programme, tidy site and a finish that lifted the whole house.”
Illustrative feedback — WC1 basement (portfolio example, not a real client review)
Project area
Approximate area only — Bloomsbury, WC1. No property addresses are published.
Related projects
All projects →
TW1Basement & Cellar Conversions · 2020
Twickenham Basement Conversion
A cellar dig-out and tanking scheme turning dead storage into habitable living space. Sample case study set in Twickenham (TW1).
View project →
W5Basement & Cellar Conversions · 2023
Ealing Basement Conversion
A cellar dig-out and tanking scheme turning dead storage into habitable living space. Sample case study set in Ealing (W5).
View project →
IG1Basement & Cellar Conversions · 2020
Ilford Basement Conversion
A cellar dig-out and tanking scheme turning dead storage into habitable living space. Sample case study set in Ilford (IG1).
View project →