Central London · WC1 · 2023
Bloomsbury Office Fit Out
Category
Office Fit Outs
Area
Bloomsbury (WC1)
Duration
16 weeks
Completed
2023
Overview
A Cat B office fit out with glazed meeting rooms, acoustic treatment and new services. Sample case study set in Bloomsbury (WC1).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Painting & decorating
- Waste management
- Structural calculations
- Groundworks
- Roofing & leadwork
- Plastering
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 16 weeks
Gallery















Client feedback (illustrative)
“A difficult structure handled calmly and finished beautifully.”
Illustrative feedback — WC1 office (portfolio example, not a real client review)
Project area
Approximate area only — Bloomsbury, WC1. No property addresses are published.
Related projects
All projects →
W11Office Fit Outs · 2025
Notting Hill Office Fit Out
A Cat B office fit out with glazed meeting rooms, acoustic treatment and new services. Sample case study set in Notting Hill (W11).
View project →
E10Office Fit Outs · 2022
Leyton Office Fit Out
A Cat B office fit out with glazed meeting rooms, acoustic treatment and new services. Sample case study set in Leyton (E10).
View project →
TW1Office Fit Outs · 2019
Twickenham Office Fit Out
A Cat B office fit out with glazed meeting rooms, acoustic treatment and new services. Sample case study set in Twickenham (TW1).
View project →