Overview

Penthouse bathroom with a backlit onyx feature wall, sunken bath and full-height glazing to the skyline. Sample luxury bathroom case study set in Canary Wharf (E14).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Design & specification
  • Strip-out & waste removal
  • Structural alterations
  • Plumbing first fix
  • Underfloor heating
  • Electrics & lighting
  • Tanking & waterproofing
  • Stone & tiling
  • Bespoke joinery
  • Plumbing second fix
  • Decoration
  • Snagging & handover

Materials used

Backlit onyxPolished chromeLarge-format porcelainSmoked mirror

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 13 weeks

Gallery

Canary Wharf Onyx Penthouse Bathroom — Completed bathroom
Completed bathroom
Canary Wharf Onyx Penthouse Bathroom — Plumber — first & second fix
Plumber — first & second fix
Canary Wharf Onyx Penthouse Bathroom — Tiler — stone and tiling works
Tiler — stone and tiling works

Client feedback (illustrative)

A difficult structure handled calmly and finished beautifully.

Illustrative feedback — E14 luxury bathroom (portfolio example, not a real client review)

Project area

Approximate area only — Canary Wharf, E14. No property addresses are published.