
West London · SW3 · 2023
Chelsea Plastering
Category
Plastering
Area
Chelsea (SW3)
Duration
16 weeks
Completed
2023
Overview
Full re-plaster with new beading, skim finish and decoration-ready walls. Sample case study set in Chelsea (SW3).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Demolition & strip-out
- Carpentry & joinery
- Electrical & lighting
- Flooring
- Building control sign-off
- Design & planning support
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 16 weeks
Gallery













Client feedback (illustrative)
“Detailing is sharp — the joinery and tiling are what make it.”
Illustrative feedback — SW3 plastering (portfolio example, not a real client review)
Project area
Approximate area only — Chelsea, SW3. No property addresses are published.
Related projects
All projects →
SW4Plastering · 2023
Clapham Plastering
Full re-plaster with new beading, skim finish and decoration-ready walls. Sample case study set in Clapham (SW4).
View project →
SE22Plastering · 2020
East Dulwich Plastering
Full re-plaster with new beading, skim finish and decoration-ready walls. Sample case study set in East Dulwich (SE22).
View project →
NW8Plastering · 2024
St John's Wood Plastering
Full re-plaster with new beading, skim finish and decoration-ready walls. Sample case study set in St John's Wood (NW8).
View project →