Chiswick Fire Damage Restoration

Category

Fire Damage Restoration

Area

Chiswick (W4)

Duration

5 months

Completed

2020

Overview

Post-fire strip-out, structural repair and complete internal reinstatement. Sample case study set in Chiswick (W4).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Waste management
  • Structural calculations
  • Groundworks
  • Roofing & leadwork
  • Plastering
  • Painting & decorating

Materials used

Porcelain large formatMarble compositeClay plasterPowder-coated steel

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 5 months

Gallery

Chiswick Fire Damage Restoration — Exterior
Exterior
Chiswick Fire Damage Restoration — Fire Damage Restoration detail
Fire Damage Restoration detail
Chiswick Fire Damage Restoration — Garden
Garden
Chiswick Fire Damage Restoration — Rear elevation
Rear elevation
Chiswick Fire Damage Restoration — Roof detail
Roof detail
Chiswick Fire Damage Restoration — Wider context
Wider context
Chiswick Fire Damage Restoration — Lower ground level
Lower ground level
Chiswick Fire Damage Restoration — Leisure space
Leisure space
Chiswick Fire Damage Restoration — Before works commenced
Before works commenced
Chiswick Fire Damage Restoration — During construction
During construction
Chiswick Fire Damage Restoration — First fix underway
First fix underway
Chiswick Fire Damage Restoration — Close-up craftsmanship
Close-up craftsmanship
Chiswick Fire Damage Restoration — Living space completed
Living space completed
Chiswick Fire Damage Restoration — Completed works
Completed works

Client feedback (illustrative)

The team worked around us and hit every milestone on the schedule.

Illustrative feedback — W4 reinstatement (portfolio example, not a real client review)

Project area

Approximate area only — Chiswick, W4. No property addresses are published.