Foxter
Clerkenwell Restaurant completed restaurants

Central London · EC1 · 2019

Clerkenwell Restaurant

Category

Restaurants

Area

Clerkenwell (EC1)

Duration

7 months

Completed

2019

Overview

A restaurant build with commercial kitchen, extract system and bespoke front-of-house joinery. Sample case study set in Clerkenwell (EC1).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Electrical & lighting
  • Flooring
  • Building control sign-off
  • Design & planning support
  • Demolition & strip-out
  • Carpentry & joinery

Materials used

Solid ash joineryAluminium glazingHoned limestonePorcelain large format

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 7 months

Gallery

Clerkenwell Restaurant — Garden
Garden
Clerkenwell Restaurant — Restaurants detail
Restaurants detail
Clerkenwell Restaurant — Rear elevation
Rear elevation
Clerkenwell Restaurant — Roof detail
Roof detail
Clerkenwell Restaurant — Wider context
Wider context
Clerkenwell Restaurant — Lower ground level
Lower ground level
Clerkenwell Restaurant — Leisure space
Leisure space
Clerkenwell Restaurant — Before works commenced
Before works commenced
Clerkenwell Restaurant — During construction
During construction
Clerkenwell Restaurant — First fix underway
First fix underway
Clerkenwell Restaurant — Close-up craftsmanship
Close-up craftsmanship
Clerkenwell Restaurant — Living space completed
Living space completed
Clerkenwell Restaurant — Kitchen detail
Kitchen detail
Clerkenwell Restaurant — Bathroom finishes
Bathroom finishes
Clerkenwell Restaurant — Completed works
Completed works

Client feedback (illustrative)

Detailing is sharp — the joinery and tiling are what make it.

Illustrative feedback — EC1 restaurant (portfolio example, not a real client review)

Project area

Approximate area only — Clerkenwell, EC1. No property addresses are published.