Foxter
Croydon Plastering completed plastering

South London · CR0 · 2024

Croydon Plastering

Category

Plastering

Area

Croydon (CR0)

Duration

20 weeks

Completed

2024

Overview

Full re-plaster with new beading, skim finish and decoration-ready walls. Sample case study set in Croydon (CR0).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Flooring
  • Building control sign-off
  • Design & planning support
  • Demolition & strip-out
  • Carpentry & joinery
  • Electrical & lighting

Materials used

Engineered oakLime mortarTerrazzoDouglas fir structure

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 20 weeks

Gallery

Croydon Plastering — Bathroom finishes
Bathroom finishes
Croydon Plastering — Plastering detail
Plastering detail
Croydon Plastering — Loft level
Loft level
Croydon Plastering — Exterior
Exterior
Croydon Plastering — Garden
Garden
Croydon Plastering — Rear elevation
Rear elevation
Croydon Plastering — Roof detail
Roof detail
Croydon Plastering — Wider context
Wider context
Croydon Plastering — Lower ground level
Lower ground level
Croydon Plastering — Leisure space
Leisure space
Croydon Plastering — Before works commenced
Before works commenced
Croydon Plastering — Completed works
Completed works

Client feedback (illustrative)

Clear programme, tidy site and a finish that lifted the whole house.

Illustrative feedback — CR0 plastering (portfolio example, not a real client review)

Project area

Approximate area only — Croydon, CR0. No property addresses are published.