Foxter
Crystal Palace Commercial Refurbishment completed commercial refurbishments

South London · SE19 · 2021

Crystal Palace Commercial Refurbishment

Category

Commercial Refurbishments

Area

Crystal Palace (SE19)

Duration

10 weeks

Completed

2021

Overview

A commercial strip-out and refit delivered in phases around trading hours. Sample case study set in Crystal Palace (SE19).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Plumbing & heating
  • Tiling
  • Bespoke kitchen install
  • Snagging & handover
  • Party wall coordination
  • Steelwork

Materials used

Blackened metalworkZinc standing seamNatural slateSolid ash joinery

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 10 weeks

Gallery

Crystal Palace Commercial Refurbishment — Loft level
Loft level
Crystal Palace Commercial Refurbishment — Commercial Refurbishments detail
Commercial Refurbishments detail
Crystal Palace Commercial Refurbishment — Exterior
Exterior
Crystal Palace Commercial Refurbishment — Garden
Garden
Crystal Palace Commercial Refurbishment — Rear elevation
Rear elevation
Crystal Palace Commercial Refurbishment — Roof detail
Roof detail
Crystal Palace Commercial Refurbishment — Wider context
Wider context
Crystal Palace Commercial Refurbishment — Lower ground level
Lower ground level
Crystal Palace Commercial Refurbishment — Leisure space
Leisure space
Crystal Palace Commercial Refurbishment — Before works commenced
Before works commenced
Crystal Palace Commercial Refurbishment — During construction
During construction
Crystal Palace Commercial Refurbishment — First fix underway
First fix underway
Crystal Palace Commercial Refurbishment — Close-up craftsmanship
Close-up craftsmanship
Crystal Palace Commercial Refurbishment — Completed works
Completed works

Client feedback (illustrative)

Budget held, drawings were followed, handover was painless.

Illustrative feedback — SE19 commercial unit (portfolio example, not a real client review)