Foxter
Greenwich Retail Unit completed retail units

South London · SE10 · 2023

Greenwich Retail Unit

Category

Retail Units

Area

Greenwich (SE10)

Duration

5 months

Completed

2023

Overview

A retail unit fit out with display joinery, track lighting and durable flooring. Sample case study set in Greenwich (SE10).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Carpentry & joinery
  • Electrical & lighting
  • Flooring
  • Building control sign-off
  • Design & planning support
  • Demolition & strip-out

Materials used

Engineered oakLime mortarTerrazzoDouglas fir structure

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 5 months

Gallery

Greenwich Retail Unit — Close-up craftsmanship
Close-up craftsmanship
Greenwich Retail Unit — Retail Units detail
Retail Units detail
Greenwich Retail Unit — Living space completed
Living space completed
Greenwich Retail Unit — Kitchen detail
Kitchen detail
Greenwich Retail Unit — Bathroom finishes
Bathroom finishes
Greenwich Retail Unit — Loft level
Loft level
Greenwich Retail Unit — Exterior
Exterior
Greenwich Retail Unit — Garden
Garden
Greenwich Retail Unit — Rear elevation
Rear elevation
Greenwich Retail Unit — Completed works
Completed works

Client feedback (illustrative)

Clear programme, tidy site and a finish that lifted the whole house.

Illustrative feedback — SE10 retail unit (portfolio example, not a real client review)

Project area

Approximate area only — Greenwich, SE10. No property addresses are published.