Hackney Plastering completed plastering

East London · E8 · 2023

Hackney Plastering

Category

Plastering

Area

Hackney (E8)

Duration

14 weeks

Completed

2023

Overview

Full re-plaster with new beading, skim finish and decoration-ready walls. Sample case study set in Hackney (E8).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Waste management
  • Structural calculations
  • Groundworks
  • Roofing & leadwork
  • Plastering
  • Painting & decorating

Materials used

Porcelain large formatMarble compositeClay plasterPowder-coated steel

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 14 weeks

Gallery

Hackney Plastering — Leisure space
Leisure space
Hackney Plastering — Plastering detail
Plastering detail
Hackney Plastering — Before works commenced
Before works commenced
Hackney Plastering — During construction
During construction
Hackney Plastering — First fix underway
First fix underway
Hackney Plastering — Close-up craftsmanship
Close-up craftsmanship
Hackney Plastering — Living space completed
Living space completed
Hackney Plastering — Kitchen detail
Kitchen detail
Hackney Plastering — Bathroom finishes
Bathroom finishes
Hackney Plastering — Completed works
Completed works

Client feedback (illustrative)

The team worked around us and hit every milestone on the schedule.

Illustrative feedback — E8 plastering (portfolio example, not a real client review)