Foxter
Kensington Full House Renovation completed full house renovations

West London · W8 · 2019

Kensington Full House Renovation

Category

Full House Renovations

Area

Kensington (W8)

Duration

20 weeks

Completed

2019

Overview

A whole-house refurbishment stripped back to brick and rebuilt with new services, joinery and finishes. Sample case study set in Kensington (W8).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Plumbing & heating
  • Tiling
  • Bespoke kitchen install
  • Snagging & handover
  • Party wall coordination
  • Steelwork

Materials used

Blackened metalworkZinc standing seamNatural slateSolid ash joinery

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 20 weeks

Gallery

Kensington Full House Renovation — During construction
During construction
Kensington Full House Renovation — Full House Renovations detail
Full House Renovations detail
Kensington Full House Renovation — First fix underway
First fix underway
Kensington Full House Renovation — Close-up craftsmanship
Close-up craftsmanship
Kensington Full House Renovation — Living space completed
Living space completed
Kensington Full House Renovation — Kitchen detail
Kitchen detail
Kensington Full House Renovation — Bathroom finishes
Bathroom finishes
Kensington Full House Renovation — Loft level
Loft level
Kensington Full House Renovation — Exterior
Exterior
Kensington Full House Renovation — Garden
Garden
Kensington Full House Renovation — Rear elevation
Rear elevation
Kensington Full House Renovation — Roof detail
Roof detail
Kensington Full House Renovation — Wider context
Wider context
Kensington Full House Renovation — Completed works
Completed works

Client feedback (illustrative)

Budget held, drawings were followed, handover was painless.

Illustrative feedback — W8 whole house (portfolio example, not a real client review)

Project area

Approximate area only — Kensington, W8. No property addresses are published.