Foxter
Kensington Indoor Pool completed indoor swimming pools

West London · W8 · 2022

Kensington Indoor Pool

Category

Indoor Swimming Pools

Area

Kensington (W8)

Duration

10 months

Completed

2022

Overview

Mosaic-tiled lap pool in a dug-out cellar with steam room and changing suite. Sample case study set in Kensington (W8).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Design & planning support
  • Structural calculations
  • Excavation & underpinning
  • Reinforced concrete pool tank
  • Tanking & waterproofing
  • Tiling
  • Plant room & filtration
  • Dehumidification & air handling
  • Electrical & lighting
  • Snagging & handover

Materials used

TerrazzoBrushed brassMicro-cementMarble composite

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 10 months

Gallery

Kensington Indoor Pool — Completed pool
Completed pool
Kensington Indoor Pool — Wider setting
Wider setting
Kensington Indoor Pool — Detail
Detail
Kensington Indoor Pool — During construction
During construction

Client feedback (illustrative)

The team worked around us and hit every milestone on the schedule.

Illustrative feedback — W8 indoor pool (portfolio example, not a real client review)