Maida Vale New Build completed new builds

North West London · W9 · 2019

Maida Vale New Build

Category

New Builds

Area

Maida Vale (W9)

Duration

8 weeks

Completed

2019

Overview

A new-build infill dwelling from foundations to handover on a tight urban plot. Sample case study set in Maida Vale (W9).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Painting & decorating
  • Waste management
  • Structural calculations
  • Groundworks
  • Roofing & leadwork
  • Plastering

Materials used

Douglas fir structureMicro-cementBrushed brassBlackened metalwork

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 8 weeks

Gallery

Maida Vale New Build — Roof detail
Roof detail
Maida Vale New Build — New Builds detail
New Builds detail
Maida Vale New Build — Wider context
Wider context
Maida Vale New Build — Lower ground level
Lower ground level
Maida Vale New Build — Leisure space
Leisure space
Maida Vale New Build — Before works commenced
Before works commenced
Maida Vale New Build — During construction
During construction
Maida Vale New Build — First fix underway
First fix underway
Maida Vale New Build — Close-up craftsmanship
Close-up craftsmanship
Maida Vale New Build — Living space completed
Living space completed
Maida Vale New Build — Completed works
Completed works

Client feedback (illustrative)

A difficult structure handled calmly and finished beautifully.

Illustrative feedback — W9 new build (portfolio example, not a real client review)

Project area

Approximate area only — Maida Vale, W9. No property addresses are published.