Foxter
Notting Hill Air Conditioning completed air conditioning

West London · W11 · 2024

Notting Hill Air Conditioning

Category

Air Conditioning

Area

Notting Hill (W11)

Duration

24 weeks

Completed

2024

Overview

Concealed air conditioning with ducted units and discrete linear grilles. Sample case study set in Notting Hill (W11).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Tiling
  • Bespoke kitchen install
  • Snagging & handover
  • Party wall coordination
  • Steelwork
  • Plumbing & heating

Materials used

Powder-coated steelReclaimed London stock brickPolished concreteEngineered oak

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 24 weeks

Gallery

Notting Hill Air Conditioning — Loft level
Loft level
Notting Hill Air Conditioning — Air Conditioning detail
Air Conditioning detail
Notting Hill Air Conditioning — Exterior
Exterior
Notting Hill Air Conditioning — Garden
Garden
Notting Hill Air Conditioning — Rear elevation
Rear elevation
Notting Hill Air Conditioning — Roof detail
Roof detail
Notting Hill Air Conditioning — Wider context
Wider context
Notting Hill Air Conditioning — Lower ground level
Lower ground level
Notting Hill Air Conditioning — Leisure space
Leisure space
Notting Hill Air Conditioning — Before works commenced
Before works commenced
Notting Hill Air Conditioning — During construction
During construction
Notting Hill Air Conditioning — First fix underway
First fix underway
Notting Hill Air Conditioning — Completed works
Completed works

Client feedback (illustrative)

Communication was steady from first survey through to snagging.

Illustrative feedback — W11 cooling (portfolio example, not a real client review)

Project area

Approximate area only — Notting Hill, W11. No property addresses are published.