West London · W11 · 2022
Notting Hill Full House Renovation
Category
Full House Renovations
Area
Notting Hill (W11)
Duration
24 weeks
Completed
2022
Overview
A whole-house refurbishment stripped back to brick and rebuilt with new services, joinery and finishes. Sample case study set in Notting Hill (W11).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Painting & decorating
- Waste management
- Structural calculations
- Groundworks
- Roof coverings & leadwork within main works
- Plastering
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 24 weeks
Gallery















Client feedback (illustrative)
“A difficult structure handled calmly and finished beautifully.”
Illustrative feedback — W11 whole house (portfolio example, not a real client review)
Project area
Approximate area only — Notting Hill, W11. No property addresses are published.
Related projects
All projects →
SW18Full House Renovations · 2019
Wandsworth Full House Renovation
A whole-house refurbishment stripped back to brick and rebuilt with new services, joinery and finishes. Sample case study set in Wandsworth (SW18).
View project →
TW9Full House Renovations · 2022
Richmond Full House Renovation
A whole-house refurbishment stripped back to brick and rebuilt with new services, joinery and finishes. Sample case study set in Richmond (TW9).
View project →
SE1Full House Renovations · 2023
Bermondsey Full House Renovation
A whole-house refurbishment stripped back to brick and rebuilt with new services, joinery and finishes. Sample case study set in Bermondsey (SE1).
View project →