Overview

Warm minimal ensuite with micro-cement walls, a solid travertine vanity, twin basins and backlit antique mirrors. Sample luxury bathroom case study set in Notting Hill (W11).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Design & specification
  • Strip-out & waste removal
  • Structural alterations
  • Plumbing first fix
  • Underfloor heating
  • Electrics & lighting
  • Tanking & waterproofing
  • Stone & tiling
  • Bespoke joinery
  • Plumbing second fix
  • Decoration
  • Snagging & handover

Materials used

TravertineMicro-cementRift-sawn oakMatt black brassware

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 10 weeks

Gallery

Notting Hill Travertine Master Ensuite — Completed bathroom
Completed bathroom
Notting Hill Travertine Master Ensuite — Plumber — first & second fix
Plumber — first & second fix
Notting Hill Travertine Master Ensuite — Tiler — stone and tiling works
Tiler — stone and tiling works

Client feedback (illustrative)

The team worked around us and hit every milestone on the schedule.

Illustrative feedback — W11 luxury bathroom (portfolio example, not a real client review)

Project area

Approximate area only — Notting Hill, W11. No property addresses are published.