Central London · SW1V · 2022
Pimlico Full House Renovation
Category
Full House Renovations
Area
Pimlico (SW1V)
Duration
14 weeks
Completed
2022
Overview
A whole-house refurbishment stripped back to brick and rebuilt with new services, joinery and finishes. Sample case study set in Pimlico (SW1V).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Bespoke kitchen install
- Snagging & handover
- Party wall coordination
- Steelwork
- Plumbing & heating
- Tiling
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 14 weeks
Gallery










Client feedback (illustrative)
“Budget held, drawings were followed, handover was painless.”
Illustrative feedback — SW1V whole house (portfolio example, not a real client review)
Project area
Approximate area only — Pimlico, SW1V. No property addresses are published.
Related projects
All projects →
SW18Full House Renovations · 2019
Wandsworth Full House Renovation
A whole-house refurbishment stripped back to brick and rebuilt with new services, joinery and finishes. Sample case study set in Wandsworth (SW18).
View project →
SE1Full House Renovations · 2023
Bermondsey Full House Renovation
A whole-house refurbishment stripped back to brick and rebuilt with new services, joinery and finishes. Sample case study set in Bermondsey (SE1).
View project →
E2Full House Renovations · 2019
Shoreditch Full House Renovation
A whole-house refurbishment stripped back to brick and rebuilt with new services, joinery and finishes. Sample case study set in Shoreditch (E2).
View project →