Foxter
Agent
Shoreditch Nero Marquina Wet Room completed bathroom renovations

East London · EC2A · 2024

Shoreditch Nero Marquina Wet Room

Category

Bathroom Renovations

Area

Shoreditch (EC2A)

Duration

11 weeks

Completed

2024

Overview

Full-black wet room in a warehouse conversion, honed nero marquina with a crittall screen and concealed drainage. Sample luxury bathroom case study set in Shoreditch (EC2A).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Design & specification
  • Strip-out & waste removal
  • Structural alterations
  • Plumbing first fix
  • Underfloor heating
  • Electrics & lighting
  • Tanking & waterproofing
  • Stone & tiling
  • Bespoke joinery
  • Plumbing second fix
  • Decoration
  • Snagging & handover

Materials used

Nero marquina marbleBlackened steelMicro-cementBrushed gunmetal

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 11 weeks

Gallery

Shoreditch Nero Marquina Wet Room — Completed bathroom
Completed bathroom
Shoreditch Nero Marquina Wet Room — Plumber — first & second fix
Plumber — first & second fix
Shoreditch Nero Marquina Wet Room — Tiler — stone and tiling works
Tiler — stone and tiling works

Client feedback (illustrative)

Communication was steady from first survey through to snagging.

Illustrative feedback — EC2A luxury bathroom (portfolio example, not a real client review)

Project area

Approximate area only — Shoreditch, EC2A. No property addresses are published.