Stoke Newington Carpentry completed carpentry

North London · N16 · 2023

Stoke Newington Carpentry

Category

Carpentry

Area

Stoke Newington (N16)

Duration

6 weeks

Completed

2023

Overview

Bespoke joinery — wardrobes, panelling and a hardwood staircase built on site. Sample case study set in Stoke Newington (N16).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Design & planning support
  • Demolition & strip-out
  • Carpentry & joinery
  • Electrical & lighting
  • Flooring
  • Building control sign-off

Materials used

Engineered oakLime mortarTerrazzoDouglas fir structure

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 6 weeks

Gallery

Stoke Newington Carpentry — Before works commenced
Before works commenced
Stoke Newington Carpentry — Carpentry detail
Carpentry detail
Stoke Newington Carpentry — During construction
During construction
Stoke Newington Carpentry — First fix underway
First fix underway
Stoke Newington Carpentry — Close-up craftsmanship
Close-up craftsmanship
Stoke Newington Carpentry — Living space completed
Living space completed
Stoke Newington Carpentry — Kitchen detail
Kitchen detail
Stoke Newington Carpentry — Bathroom finishes
Bathroom finishes
Stoke Newington Carpentry — Loft level
Loft level
Stoke Newington Carpentry — Exterior
Exterior
Stoke Newington Carpentry — Garden
Garden
Stoke Newington Carpentry — Completed works
Completed works

Client feedback (illustrative)

Clear programme, tidy site and a finish that lifted the whole house.

Illustrative feedback — N16 joinery (portfolio example, not a real client review)

Project area

Approximate area only — Stoke Newington, N16. No property addresses are published.