Stratford Water Damage Restoration completed water damage restoration

East London · E15 · 2019

Stratford Water Damage Restoration

Category

Water Damage Restoration

Area

Stratford (E15)

Duration

5 months

Completed

2019

Overview

Escape-of-water reinstatement including drying, strip-out and full rebuild. Sample case study set in Stratford (E15).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Flooring
  • Building control sign-off
  • Design & planning support
  • Demolition & strip-out
  • Carpentry & joinery
  • Electrical & lighting

Materials used

Engineered oakLime mortarTerrazzoDouglas fir structure

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 5 months

Gallery

Stratford Water Damage Restoration — Close-up craftsmanship
Close-up craftsmanship
Stratford Water Damage Restoration — Water Damage Restoration detail
Water Damage Restoration detail
Stratford Water Damage Restoration — Living space completed
Living space completed
Stratford Water Damage Restoration — Kitchen detail
Kitchen detail
Stratford Water Damage Restoration — Bathroom finishes
Bathroom finishes
Stratford Water Damage Restoration — Loft level
Loft level
Stratford Water Damage Restoration — Exterior
Exterior
Stratford Water Damage Restoration — Garden
Garden
Stratford Water Damage Restoration — Rear elevation
Rear elevation
Stratford Water Damage Restoration — Completed works
Completed works

Client feedback (illustrative)

Clear programme, tidy site and a finish that lifted the whole house.

Illustrative feedback — E15 reinstatement (portfolio example, not a real client review)

Project area

Approximate area only — Stratford, E15. No property addresses are published.