Foxter
Wembley Driveway completed driveways

North West London · HA9 · 2024

Wembley Driveway

Category

Driveways

Area

Wembley (HA9)

Duration

16 weeks

Completed

2024

Overview

A permeable resin-bound driveway with new drainage and front boundary works. Sample case study set in Wembley (HA9).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Building control sign-off
  • Design & planning support
  • Demolition & strip-out
  • Carpentry & joinery
  • Electrical & lighting
  • Flooring

Materials used

Solid ash joineryAluminium glazingHoned limestonePorcelain large format

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 16 weeks

Gallery

Wembley Driveway — Before works commenced
Before works commenced
Wembley Driveway — Driveways detail
Driveways detail
Wembley Driveway — During construction
During construction
Wembley Driveway — First fix underway
First fix underway
Wembley Driveway — Close-up craftsmanship
Close-up craftsmanship
Wembley Driveway — Living space completed
Living space completed
Wembley Driveway — Kitchen detail
Kitchen detail
Wembley Driveway — Bathroom finishes
Bathroom finishes
Wembley Driveway — Loft level
Loft level
Wembley Driveway — Exterior
Exterior
Wembley Driveway — Garden
Garden
Wembley Driveway — Rear elevation
Rear elevation
Wembley Driveway — Roof detail
Roof detail
Wembley Driveway — Wider context
Wider context
Wembley Driveway — Completed works
Completed works

Client feedback (illustrative)

Detailing is sharp — the joinery and tiling are what make it.

Illustrative feedback — HA9 driveway (portfolio example, not a real client review)

Project area

Approximate area only — Wembley, HA9. No property addresses are published.