North West London · HA9 · 2024
Wembley Driveway
Category
Driveways
Area
Wembley (HA9)
Duration
16 weeks
Completed
2024
Overview
A permeable resin-bound driveway with new drainage and front boundary works. Sample case study set in Wembley (HA9).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Building control sign-off
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
- Electrical & lighting
- Flooring
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 16 weeks
Gallery















Client feedback (illustrative)
“Detailing is sharp — the joinery and tiling are what make it.”
Illustrative feedback — HA9 driveway (portfolio example, not a real client review)
Project area
Approximate area only — Wembley, HA9. No property addresses are published.
Related projects
All projects →
N8Driveways · 2021
Crouch End Driveway
A permeable resin-bound driveway with new drainage and front boundary works. Sample case study set in Crouch End (N8).
View project →
NW10Driveways · 2020
Willesden Driveway
A permeable resin-bound driveway with new drainage and front boundary works. Sample case study set in Willesden (NW10).