Foxter
Bathroom Renovations in Marylebone, London W1 — Foxter portfolio example

Bathroom renovations in Marylebone

W1 · Central London · Waterproofed properly, finished beautifully

Indicative local rate

£11,210 / unit

Area factor

Central London ×1.18

Typical programme

2–6 weeks

Postcode

W1

Bathroom Renovations in Marylebone

A bathroom is a small room with more trades per square metre than anywhere else in the house: demolition, plumbing, electrics, carpentry, tanking, tiling, glazing and decoration all inside a few weeks. Get the sequence or the waterproofing wrong and the failure shows up on the ceiling below a year later.

Marylebone's Georgian townhouses and mansion blocks are tightly controlled and tightly serviced, so programmes are built around delivery windows and noise hours.

That context shapes how we approach bathroom renovations here. Delivery windows, congestion and ULEZ charges, loading bay bookings and strict noise hours all apply, so programmes are planned around agreed access slots. We survey the property, confirm the consents that apply to W1 and issue a fixed price against a written scope, so the figure you sign is the figure you pay unless you change the brief.

Our indicative rate for bathroom renovations in Central London is around £11,210 per unit, reflecting a ×1.18 area factor against our London baseline. Use the instant quotation tool for a figure tailored to your size, specification and start date.

Included in Marylebone

  • Design, sanitaryware selection and setting-out drawings
  • Strip-out, waste removal and floor preparation
  • New hot and cold pipework, waste runs and stack connections
  • Electrical circuits, IP-rated lighting, shaver points and extraction
  • Full tanking of wet areas and shower trays or formers
  • Underfloor heating and self-levelling screed
  • Large format porcelain, ceramic or natural stone tiling
  • Sanitaryware, brassware, shower screens and mirrors installation

How the job runs

01

Design and specification

Layout, setting-out, tile sizes and every fitting selected and ordered before we start, so the room is not held up by a two-week lead time.

02

Strip-out

Existing suite removed, floors and walls checked for rot, damp and joist condition.

03

First fix

Pipework, wastes, wall-hung frames, electrics and extraction installed and pressure tested.

04

Waterproofing

Boarding, tanking membrane, shower former and underfloor heating laid and tested.

05

Tiling

Levelling, tiling to the setting-out plan, grouting and silicone.

06

Second fix and handover

Sanitaryware, brassware, screens, accessories, commissioning and a certified electrical installation.

Waterproofing is the whole job

Tiles and grout are not waterproof. Water passes through grout lines, and the layer behind them is what protects the structure. We use cement or foam backer boards rather than plasterboard in wet zones, apply a liquid or sheet tanking membrane with taped joints at every corner and pipe penetration, and form shower floors with a purpose-made tray or a graded former.

That detail is invisible when the job is finished, which is exactly why it is the first thing to be cut on a cheap quote. On a first-floor bathroom over a living room it is the difference between a beautiful room and a five-figure insurance claim.

Bathroom renovations examples in Central London

Illustrative concept case studies — not records of specific client contracts.

Bathroom renovations in Marylebone: common questions

How long does a bathroom take?

2–3 weeks for a standard replacement in the same layout, 3–5 weeks for a full wet room or where the layout moves and the floor is rebuilt.

How much does a London bathroom cost?

Our indicative starting point is around £12,500 for a complete bathroom including strip-out, services, tanking, tiling and mid-range sanitaryware. Natural stone, bespoke joinery and premium brassware push it higher.

Can I have a wet room upstairs?

Yes, with the right build-up. We either recess a former between the joists or step the floor up slightly to build the fall, and fully tank the room. A structural check on the joists comes first.

Is underfloor heating worth it?

In a bathroom, yes. Electric mat heating is inexpensive to install as part of a refit, dries the floor quickly and frees wall space.

W1

Start your bathroom renovations in Marylebone

Other trades in Marylebone