Overview
Post-fire strip-out, structural repair and complete internal reinstatement. Sample case study set in Acton (W3).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Plastering
- Painting & decorating
- Waste management
- Structural calculations
- Groundworks
- Roofing & leadwork
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 6 weeks
Gallery










Client feedback (illustrative)
“The team worked around us and hit every milestone on the schedule.”
Illustrative feedback — W3 reinstatement (portfolio example, not a real client review)
Project area
Approximate area only — Acton, W3. No property addresses are published.
Related projects
All projects →
KT1Fire Damage Restoration · 2024
Kingston Fire Damage Restoration
Post-fire strip-out, structural repair and complete internal reinstatement. Sample case study set in Kingston (KT1).
View project →
EC1Fire Damage Restoration · 2021
Clerkenwell Fire Damage Restoration
Post-fire strip-out, structural repair and complete internal reinstatement. Sample case study set in Clerkenwell (EC1).
View project →
W4Fire Damage Restoration · 2020
Chiswick Fire Damage Restoration
Post-fire strip-out, structural repair and complete internal reinstatement. Sample case study set in Chiswick (W4).
View project →