Bermondsey Electrical completed electrical

South London · SE1 · 2021

Bermondsey Electrical

Category

Electrical

Area

Bermondsey (SE1)

Duration

16 weeks

Completed

2021

Overview

Full rewire with new consumer unit, lighting design and smart controls. Sample case study set in Bermondsey (SE1).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Roofing & leadwork
  • Plastering
  • Painting & decorating
  • Waste management
  • Structural calculations
  • Groundworks

Materials used

Douglas fir structureMicro-cementBrushed brassBlackened metalwork

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 16 weeks

Gallery

Bermondsey Electrical — Kitchen detail
Kitchen detail
Bermondsey Electrical — Electrical detail
Electrical detail
Bermondsey Electrical — Bathroom finishes
Bathroom finishes
Bermondsey Electrical — Loft level
Loft level
Bermondsey Electrical — Exterior
Exterior
Bermondsey Electrical — Garden
Garden
Bermondsey Electrical — Rear elevation
Rear elevation
Bermondsey Electrical — Roof detail
Roof detail
Bermondsey Electrical — Wider context
Wider context
Bermondsey Electrical — Lower ground level
Lower ground level
Bermondsey Electrical — Completed works
Completed works

Client feedback (illustrative)

A difficult structure handled calmly and finished beautifully.

Illustrative feedback — SE1 electrical (portfolio example, not a real client review)

Project area

Approximate area only — Bermondsey, SE1. No property addresses are published.