
South London · SW2 · 2024
Brixton Electrical
Category
Electrical
Area
Brixton (SW2)
Duration
12 weeks
Completed
2024
Overview
Full rewire with new consumer unit, lighting design and smart controls. Sample case study set in Brixton (SW2).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Painting & decorating
- Waste management
- Structural calculations
- Groundworks
- Roofing & leadwork
- Plastering
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 12 weeks
Gallery















Client feedback (illustrative)
“A difficult structure handled calmly and finished beautifully.”
Illustrative feedback — SW2 electrical (portfolio example, not a real client review)
Project area
Approximate area only — Brixton, SW2. No property addresses are published.
Related projects
All projects →
SW11Electrical · 2020
Battersea Electrical
Full rewire with new consumer unit, lighting design and smart controls. Sample case study set in Battersea (SW11).
View project →
NW1Electrical · 2021
Camden Electrical
Full rewire with new consumer unit, lighting design and smart controls. Sample case study set in Camden (NW1).
View project →
E15Electrical · 2020
Stratford Electrical
Full rewire with new consumer unit, lighting design and smart controls. Sample case study set in Stratford (E15).
View project →