Foxter
Stratford Electrical completed electrical

East London · E15 · 2020

Stratford Electrical

Category

Electrical

Area

Stratford (E15)

Duration

12 weeks

Completed

2020

Overview

Full rewire with new consumer unit, lighting design and smart controls. Sample case study set in Stratford (E15).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Tiling
  • Bespoke kitchen install
  • Snagging & handover
  • Party wall coordination
  • Steelwork
  • Plumbing & heating

Materials used

Powder-coated steelReclaimed London stock brickPolished concreteEngineered oak

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 12 weeks

Gallery

Stratford Electrical — Lower ground level
Lower ground level
Stratford Electrical — Electrical detail
Electrical detail
Stratford Electrical — Leisure space
Leisure space
Stratford Electrical — Before works commenced
Before works commenced
Stratford Electrical — During construction
During construction
Stratford Electrical — First fix underway
First fix underway
Stratford Electrical — Close-up craftsmanship
Close-up craftsmanship
Stratford Electrical — Living space completed
Living space completed
Stratford Electrical — Kitchen detail
Kitchen detail
Stratford Electrical — Bathroom finishes
Bathroom finishes
Stratford Electrical — Loft level
Loft level
Stratford Electrical — Exterior
Exterior
Stratford Electrical — Garden
Garden
Stratford Electrical — Rear elevation
Rear elevation
Stratford Electrical — Roof detail
Roof detail
Stratford Electrical — Wider context
Wider context
Stratford Electrical — Completed works
Completed works

Client feedback (illustrative)

Communication was steady from first survey through to snagging.

Illustrative feedback — E15 electrical (portfolio example, not a real client review)

Project area

Approximate area only — Stratford, E15. No property addresses are published.