
West London · SW3 · 2019
Chelsea Loft Conversion
Category
Loft Conversions
Area
Chelsea (SW3)
Duration
6 weeks
Completed
2019
Overview
A dormer loft conversion creating a light-filled top-floor suite with steel framed glazing and full insulation upgrade. Sample case study set in Chelsea (SW3).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
- Electrical & lighting
- Flooring
- Building control sign-off
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 6 weeks
Gallery










Client feedback (illustrative)
“Clear programme, tidy site and a finish that lifted the whole house.”
Illustrative feedback — SW3 loft suite (portfolio example, not a real client review)
Project area
Approximate area only — Chelsea, SW3. No property addresses are published.
Related projects
All projects →
E3Loft Conversions · 2023
Bow Loft Conversion
A dormer loft conversion creating a light-filled top-floor suite with steel framed glazing and full insulation upgrade. Sample case study set in Bow (E3).
View project →
SW17Loft Conversions · 2020
Tooting Loft Conversion
A dormer loft conversion creating a light-filled top-floor suite with steel framed glazing and full insulation upgrade. Sample case study set in Tooting (SW17).
View project →
SM1Loft Conversions · 2024
Sutton Loft Conversion
A dormer loft conversion creating a light-filled top-floor suite with steel framed glazing and full insulation upgrade. Sample case study set in Sutton (SM1).
View project →