
South London · SM1 · 2024
Sutton Loft Conversion
Category
Loft Conversions
Area
Sutton (SM1)
Duration
12 weeks
Completed
2024
Overview
A dormer loft conversion creating a light-filled top-floor suite with steel framed glazing and full insulation upgrade. Sample case study set in Sutton (SM1).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Demolition & strip-out
- Carpentry & joinery
- Electrical & lighting
- Flooring
- Building control sign-off
- Design & planning support
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 12 weeks
Gallery













Client feedback (illustrative)
“Detailing is sharp — the joinery and tiling are what make it.”
Illustrative feedback — SM1 loft suite (portfolio example, not a real client review)
Project area
Approximate area only — Sutton, SM1. No property addresses are published.
Related projects
All projects →
SW3Loft Conversions · 2019
Chelsea Loft Conversion
A dormer loft conversion creating a light-filled top-floor suite with steel framed glazing and full insulation upgrade. Sample case study set in Chelsea (SW3).
View project →
E3Loft Conversions · 2023
Bow Loft Conversion
A dormer loft conversion creating a light-filled top-floor suite with steel framed glazing and full insulation upgrade. Sample case study set in Bow (E3).
View project →
SW17Loft Conversions · 2020
Tooting Loft Conversion
A dormer loft conversion creating a light-filled top-floor suite with steel framed glazing and full insulation upgrade. Sample case study set in Tooting (SW17).
View project →