West London · W4 · 2021
Chiswick Gas Installation
Category
Gas Installation
Area
Chiswick (W4)
Duration
12 weeks
Completed
2021
Overview
Gas supply upgrade and appliance installation certified on completion. Sample case study set in Chiswick (W4).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Building control sign-off
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
- Electrical & lighting
- Flooring
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 12 weeks
Gallery













Client feedback (illustrative)
“Detailing is sharp — the joinery and tiling are what make it.”
Illustrative feedback — W4 gas works (portfolio example, not a real client review)
Project area
Approximate area only — Chiswick, W4. No property addresses are published.
Related projects
All projects →
E1WGas Installation · 2025
Wapping Gas Installation
Gas supply upgrade and appliance installation certified on completion. Sample case study set in Wapping (E1W).
View project →
N1Gas Installation · 2022
Islington Gas Installation
Gas supply upgrade and appliance installation certified on completion. Sample case study set in Islington (N1).
View project →
WC2Gas Installation · 2019
Covent Garden Gas Installation
Gas supply upgrade and appliance installation certified on completion. Sample case study set in Covent Garden (WC2).
View project →