Islington Gas Installation completed gas installation

North London · N1 · 2022

Islington Gas Installation

Category

Gas Installation

Area

Islington (N1)

Duration

16 weeks

Completed

2022

Overview

Gas supply upgrade and appliance installation certified on completion. Sample case study set in Islington (N1).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Tiling
  • Bespoke kitchen install
  • Snagging & handover
  • Party wall coordination
  • Steelwork
  • Plumbing & heating

Materials used

Powder-coated steelReclaimed London stock brickPolished concreteEngineered oak

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 16 weeks

Gallery

Islington Gas Installation — Rear elevation
Rear elevation
Islington Gas Installation — Gas Installation detail
Gas Installation detail
Islington Gas Installation — Roof detail
Roof detail
Islington Gas Installation — Wider context
Wider context
Islington Gas Installation — Lower ground level
Lower ground level
Islington Gas Installation — Leisure space
Leisure space
Islington Gas Installation — Before works commenced
Before works commenced
Islington Gas Installation — During construction
During construction
Islington Gas Installation — First fix underway
First fix underway
Islington Gas Installation — Close-up craftsmanship
Close-up craftsmanship
Islington Gas Installation — Living space completed
Living space completed
Islington Gas Installation — Kitchen detail
Kitchen detail
Islington Gas Installation — Bathroom finishes
Bathroom finishes
Islington Gas Installation — Loft level
Loft level
Islington Gas Installation — Completed works
Completed works

Client feedback (illustrative)

Communication was steady from first survey through to snagging.

Illustrative feedback — N1 gas works (portfolio example, not a real client review)

Project area

Approximate area only — Islington, N1. No property addresses are published.