Foxter
Agent
Clapham Master Suite Loft — Completed completed loft conversions

South West London · SW4 · 2025

Clapham Master Suite Loft — Completed

Category

Loft Conversions

Area

Clapham (SW4)

Duration

12 weeks

Completed

2025

Overview

Completed loft master bedroom with vaulted ceiling, twin rooflights, fitted wardrobes and a window seat in the dormer. Sample loft conversion case study in Clapham (SW4) — completed stage, built by the Foxter site team.

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Structural design & calculations
  • Building control & party wall
  • Scaffold & roof strip-out
  • Steel beam installation
  • New floor joists & decking
  • Dormer construction & roofing
  • Rooflights & windows
  • Insulation & fire protection
  • Loft staircase joinery
  • Electrics & plumbing first fix
  • Plastering & decoration
  • Snagging & handover

Materials used

Engineered oak floorFitted joineryRooflightsPlaster skim finish

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 12 weeks

Gallery

Clapham Master Suite Loft — Completed — Finished loft master bedroom
Finished loft master bedroom
Clapham Master Suite Loft — Completed — The same roof during the steel installation
The same roof during the steel installation

Client feedback (illustrative)

A difficult structure handled calmly and finished beautifully.

Illustrative feedback — SW4 loft conversion (portfolio example, not a real client review)

Project area

Approximate area only — Clapham, SW4. No property addresses are published.