Overview

Damp survey, injected DPC, tanking and re-plastering with breathable finishes. Sample case study set in Crystal Palace (SE19).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Plastering
  • Painting & decorating
  • Waste management
  • Structural calculations
  • Groundworks
  • Roofing & leadwork

Materials used

Porcelain large formatMarble compositeClay plasterPowder-coated steel

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 10 weeks

Gallery

Crystal Palace Damp Proofing — First fix underway
First fix underway
Crystal Palace Damp Proofing — Damp Proofing detail
Damp Proofing detail
Crystal Palace Damp Proofing — Close-up craftsmanship
Close-up craftsmanship
Crystal Palace Damp Proofing — Living space completed
Living space completed
Crystal Palace Damp Proofing — Kitchen detail
Kitchen detail
Crystal Palace Damp Proofing — Bathroom finishes
Bathroom finishes
Crystal Palace Damp Proofing — Loft level
Loft level
Crystal Palace Damp Proofing — Exterior
Exterior
Crystal Palace Damp Proofing — Garden
Garden
Crystal Palace Damp Proofing — Rear elevation
Rear elevation
Crystal Palace Damp Proofing — Roof detail
Roof detail
Crystal Palace Damp Proofing — Wider context
Wider context
Crystal Palace Damp Proofing — Lower ground level
Lower ground level
Crystal Palace Damp Proofing — Leisure space
Leisure space
Crystal Palace Damp Proofing — Before works commenced
Before works commenced
Crystal Palace Damp Proofing — Completed works
Completed works

Client feedback (illustrative)

The team worked around us and hit every milestone on the schedule.

Illustrative feedback — SE19 damp works (portfolio example, not a real client review)

Project area

Approximate area only — Crystal Palace, SE19. No property addresses are published.