South London · SE15 · 2022
Peckham Damp Proofing
Category
Damp Proofing
Area
Peckham (SE15)
Duration
6 weeks
Completed
2022
Overview
Damp survey, injected DPC, tanking and re-plastering with breathable finishes. Sample case study set in Peckham (SE15).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Waste management
- Structural calculations
- Groundworks
- Roofing & leadwork
- Plastering
- Painting & decorating
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 6 weeks
Gallery












Client feedback (illustrative)
“The team worked around us and hit every milestone on the schedule.”
Illustrative feedback — SE15 damp works (portfolio example, not a real client review)
Project area
Approximate area only — Peckham, SE15. No property addresses are published.
Related projects
All projects →
W14Damp Proofing · 2025
Holland Park Damp Proofing
Damp survey, injected DPC, tanking and re-plastering with breathable finishes. Sample case study set in Holland Park (W14).
View project →
EN5Damp Proofing · 2019
Barnet Damp Proofing
Damp survey, injected DPC, tanking and re-plastering with breathable finishes. Sample case study set in Barnet (EN5).
View project →
HA9Damp Proofing · 2025
Wembley Damp Proofing
Damp survey, injected DPC, tanking and re-plastering with breathable finishes. Sample case study set in Wembley (HA9).
View project →