Foxter
Agent
Hackney Loft En-Suite — Completed completed loft conversions

East London · E8 · 2026

Hackney Loft En-Suite — Completed

Category

Loft Conversions

Area

Hackney (E8)

Duration

9 weeks

Completed

2026

Overview

Stone-tiled loft en-suite with a walk-in shower under the rooflight, brushed brass brassware and a floating vanity. Sample loft conversion case study in Hackney (E8) — completed stage, built by the Foxter site team.

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Structural design & calculations
  • Building control & party wall
  • Scaffold & roof strip-out
  • Steel beam installation
  • New floor joists & decking
  • Dormer construction & roofing
  • Rooflights & windows
  • Insulation & fire protection
  • Loft staircase joinery
  • Electrics & plumbing first fix
  • Plastering & decoration
  • Snagging & handover

Materials used

Large format stone tileBrushed brass brasswareWet-room trayRecessed lighting

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 9 weeks

Gallery

Hackney Loft En-Suite — Completed — Completed loft en-suite shower room
Completed loft en-suite shower room
Hackney Loft En-Suite — Completed — First fix stage before boarding and tiling
First fix stage before boarding and tiling

Client feedback (illustrative)

Clear programme, tidy site and a finish that lifted the whole house.

Illustrative feedback — E8 loft conversion (portfolio example, not a real client review)

Project area

Approximate area only — Hackney, E8. No property addresses are published.