
West London · W14 · 2023
Holland Park Retail Unit
Category
Retail Units
Area
Holland Park (W14)
Duration
7 months
Completed
2023
Overview
A retail unit fit out with display joinery, track lighting and durable flooring. Sample case study set in Holland Park (W14).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Tiling
- Bespoke kitchen install
- Snagging & handover
- Party wall coordination
- Steelwork
- Plumbing & heating
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 7 months
Gallery













Client feedback (illustrative)
“Communication was steady from first survey through to snagging.”
Illustrative feedback — W14 retail unit (portfolio example, not a real client review)
Project area
Approximate area only — Holland Park, W14. No property addresses are published.
Related projects
All projects →
SW6Retail Units · 2019
Fulham Retail Unit
A retail unit fit out with display joinery, track lighting and durable flooring. Sample case study set in Fulham (SW6).
View project →
SE10Retail Units · 2023
Greenwich Retail Unit
A retail unit fit out with display joinery, track lighting and durable flooring. Sample case study set in Greenwich (SE10).
View project →
N8Retail Units · 2020
Crouch End Retail Unit
A retail unit fit out with display joinery, track lighting and durable flooring. Sample case study set in Crouch End (N8).
View project →