Leyton Loft Staircase Build — On Site completed loft conversions

East London · E10 · 2025

Leyton Loft Staircase Build — On Site

Category

Loft Conversions

Area

Leyton (E10)

Duration

7 weeks

Completed

2025

Overview

New loft staircase formed off the existing landing under a trimmer steel, with fire-rated protection to the escape route. Sample loft conversion case study in Leyton (E10) — during construction stage, built by the Foxter site team.

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Structural design & calculations
  • Building control & party wall
  • Scaffold & roof strip-out
  • Steel beam installation
  • New floor joists & decking
  • Dormer construction & roofing
  • Rooflights & windows
  • Insulation & fire protection
  • Loft staircase joinery
  • Electrics & plumbing first fix
  • Plastering & decoration
  • Snagging & handover

Materials used

Trimmer steelOak stair treadsFire doorsBalustrade joinery

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 7 weeks

Gallery

Leyton Loft Staircase Build — On Site — Foxter carpenter fixing the new loft stair treads
Foxter carpenter fixing the new loft stair treads
Leyton Loft Staircase Build — On Site — The study the stair will open into
The study the stair will open into

Client feedback (illustrative)

Budget held, drawings were followed, handover was painless.

Illustrative feedback — E10 loft conversion (portfolio example, not a real client review)

Project area

Approximate area only — Leyton, E10. No property addresses are published.