Overview
Damp survey, injected DPC, tanking and re-plastering with breathable finishes. Sample case study set in Wembley (HA9).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Bespoke kitchen install
- Snagging & handover
- Party wall coordination
- Steelwork
- Plumbing & heating
- Tiling
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 6 weeks
Gallery














Client feedback (illustrative)
“Budget held, drawings were followed, handover was painless.”
Illustrative feedback — HA9 damp works (portfolio example, not a real client review)
Project area
Approximate area only — Wembley, HA9. No property addresses are published.
Related projects
All projects →
W14Damp Proofing · 2025
Holland Park Damp Proofing
Damp survey, injected DPC, tanking and re-plastering with breathable finishes. Sample case study set in Holland Park (W14).
View project →
SE15Damp Proofing · 2022
Peckham Damp Proofing
Damp survey, injected DPC, tanking and re-plastering with breathable finishes. Sample case study set in Peckham (SE15).
View project →
EN5Damp Proofing · 2019
Barnet Damp Proofing
Damp survey, injected DPC, tanking and re-plastering with breathable finishes. Sample case study set in Barnet (EN5).
View project →