
South London · SE15 · 2020
Peckham Retail Unit
Category
Retail Units
Area
Peckham (SE15)
Duration
6 weeks
Completed
2020
Overview
A retail unit fit out with display joinery, track lighting and durable flooring. Sample case study set in Peckham (SE15).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
- Electrical & lighting
- Flooring
- Building control sign-off
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 6 weeks
Gallery














Client feedback (illustrative)
“Clear programme, tidy site and a finish that lifted the whole house.”
Illustrative feedback — SE15 retail unit (portfolio example, not a real client review)
Project area
Approximate area only — Peckham, SE15. No property addresses are published.
Related projects
All projects →
SW6Retail Units · 2019
Fulham Retail Unit
A retail unit fit out with display joinery, track lighting and durable flooring. Sample case study set in Fulham (SW6).
View project →
SE10Retail Units · 2023
Greenwich Retail Unit
A retail unit fit out with display joinery, track lighting and durable flooring. Sample case study set in Greenwich (SE10).
View project →
N8Retail Units · 2020
Crouch End Retail Unit
A retail unit fit out with display joinery, track lighting and durable flooring. Sample case study set in Crouch End (N8).
View project →