Central London · SW1V · 2020
Pimlico Electrical
Category
Electrical
Area
Pimlico (SW1V)
Duration
14 weeks
Completed
2020
Overview
Full rewire with new consumer unit, lighting design and smart controls. Sample case study set in Pimlico (SW1V).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Waste management
- Structural calculations
- Groundworks
- Roofing & leadwork
- Plastering
- Painting & decorating
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 14 weeks
Gallery












Client feedback (illustrative)
“The team worked around us and hit every milestone on the schedule.”
Illustrative feedback — SW1V electrical (portfolio example, not a real client review)
Project area
Approximate area only — Pimlico, SW1V. No property addresses are published.
Related projects
All projects →
SW11Electrical · 2020
Battersea Electrical
Full rewire with new consumer unit, lighting design and smart controls. Sample case study set in Battersea (SW11).
View project →
SW2Electrical · 2024
Brixton Electrical
Full rewire with new consumer unit, lighting design and smart controls. Sample case study set in Brixton (SW2).
View project →
NW1Electrical · 2021
Camden Electrical
Full rewire with new consumer unit, lighting design and smart controls. Sample case study set in Camden (NW1).
View project →