Stoke Newington Shop Front

Category

Shop Fronts

Area

Stoke Newington (N16)

Duration

16 weeks

Completed

2024

Overview

A new shopfront in powder-coated steel with toughened glazing and illuminated signage. Sample case study set in Stoke Newington (N16).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Snagging & handover
  • Party wall coordination
  • Steelwork
  • Plumbing & heating
  • Tiling
  • Bespoke kitchen install

Materials used

Powder-coated steelReclaimed London stock brickPolished concreteEngineered oak

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 16 weeks

Gallery

Stoke Newington Shop Front — Rear elevation
Rear elevation
Stoke Newington Shop Front — Shop Fronts detail
Shop Fronts detail
Stoke Newington Shop Front — Roof detail
Roof detail
Stoke Newington Shop Front — Wider context
Wider context
Stoke Newington Shop Front — Lower ground level
Lower ground level
Stoke Newington Shop Front — Leisure space
Leisure space
Stoke Newington Shop Front — Before works commenced
Before works commenced
Stoke Newington Shop Front — During construction
During construction
Stoke Newington Shop Front — First fix underway
First fix underway
Stoke Newington Shop Front — Close-up craftsmanship
Close-up craftsmanship
Stoke Newington Shop Front — Completed works
Completed works

Client feedback (illustrative)

Communication was steady from first survey through to snagging.

Illustrative feedback — N16 shopfront (portfolio example, not a real client review)

Project area

Approximate area only — Stoke Newington, N16. No property addresses are published.