South West London · SW19 · 2020
Wimbledon Shop Front
Category
Shop Fronts
Area
Wimbledon (SW19)
Duration
16 weeks
Completed
2020
Overview
A new shopfront in powder-coated steel with toughened glazing and illuminated signage. Sample case study set in Wimbledon (SW19).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Building control sign-off
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
- Electrical & lighting
- Flooring
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 16 weeks
Gallery













Client feedback (illustrative)
“Detailing is sharp — the joinery and tiling are what make it.”
Illustrative feedback — SW19 shopfront (portfolio example, not a real client review)
Project area
Approximate area only — Wimbledon, SW19. No property addresses are published.
Related projects
All projects →
N16Shop Fronts · 2024
Stoke Newington Shop Front
A new shopfront in powder-coated steel with toughened glazing and illuminated signage. Sample case study set in Stoke Newington (N16).
View project →
HA1Shop Fronts · 2023
Harrow Shop Front
A new shopfront in powder-coated steel with toughened glazing and illuminated signage. Sample case study set in Harrow (HA1).
View project →
SE13Shop Fronts · 2024
Lewisham Shop Front
A new shopfront in powder-coated steel with toughened glazing and illuminated signage. Sample case study set in Lewisham (SE13).
View project →