Foxter
Stratford Structural Steel completed structural steel

East London · E15 · 2021

Stratford Structural Steel

Category

Structural Steel

Area

Stratford (E15)

Duration

5 months

Completed

2021

Overview

Structural steel installation removing load-bearing walls to open the ground floor plan. Sample case study set in Stratford (E15).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Plastering
  • Painting & decorating
  • Waste management
  • Structural calculations
  • Groundworks
  • Roofing & leadwork

Materials used

Porcelain large formatMarble compositeClay plasterPowder-coated steel

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 5 months

Gallery

Stratford Structural Steel — Exterior
Exterior
Stratford Structural Steel — Structural Steel detail
Structural Steel detail
Stratford Structural Steel — Garden
Garden
Stratford Structural Steel — Rear elevation
Rear elevation
Stratford Structural Steel — Roof detail
Roof detail
Stratford Structural Steel — Wider context
Wider context
Stratford Structural Steel — Lower ground level
Lower ground level
Stratford Structural Steel — Leisure space
Leisure space
Stratford Structural Steel — Before works commenced
Before works commenced
Stratford Structural Steel — During construction
During construction
Stratford Structural Steel — First fix underway
First fix underway
Stratford Structural Steel — Close-up craftsmanship
Close-up craftsmanship
Stratford Structural Steel — Living space completed
Living space completed
Stratford Structural Steel — Kitchen detail
Kitchen detail
Stratford Structural Steel — Bathroom finishes
Bathroom finishes
Stratford Structural Steel — Completed works
Completed works

Client feedback (illustrative)

The team worked around us and hit every milestone on the schedule.

Illustrative feedback — E15 structure (portfolio example, not a real client review)

Project area

Approximate area only — Stratford, E15. No property addresses are published.