Foxter
Wandsworth Structural Steel completed structural steel

South West London · SW18 · 2025

Wandsworth Structural Steel

Category

Structural Steel

Area

Wandsworth (SW18)

Duration

7 months

Completed

2025

Overview

Structural steel installation removing load-bearing walls to open the ground floor plan. Sample case study set in Wandsworth (SW18).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Snagging & handover
  • Party wall coordination
  • Steelwork
  • Plumbing & heating
  • Tiling
  • Bespoke kitchen install

Materials used

Powder-coated steelReclaimed London stock brickPolished concreteEngineered oak

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 7 months

Gallery

Wandsworth Structural Steel — Living space completed
Living space completed
Wandsworth Structural Steel — Structural Steel detail
Structural Steel detail
Wandsworth Structural Steel — Kitchen detail
Kitchen detail
Wandsworth Structural Steel — Bathroom finishes
Bathroom finishes
Wandsworth Structural Steel — Loft level
Loft level
Wandsworth Structural Steel — Exterior
Exterior
Wandsworth Structural Steel — Garden
Garden
Wandsworth Structural Steel — Rear elevation
Rear elevation
Wandsworth Structural Steel — Roof detail
Roof detail
Wandsworth Structural Steel — Wider context
Wider context
Wandsworth Structural Steel — Lower ground level
Lower ground level
Wandsworth Structural Steel — Leisure space
Leisure space
Wandsworth Structural Steel — Before works commenced
Before works commenced
Wandsworth Structural Steel — During construction
During construction
Wandsworth Structural Steel — First fix underway
First fix underway
Wandsworth Structural Steel — Close-up craftsmanship
Close-up craftsmanship
Wandsworth Structural Steel — Completed works
Completed works

Client feedback (illustrative)

Communication was steady from first survey through to snagging.

Illustrative feedback — SW18 structure (portfolio example, not a real client review)

Project area

Approximate area only — Wandsworth, SW18. No property addresses are published.