South West London · SW18 · 2025
Wandsworth Structural Steel
Category
Structural Steel
Area
Wandsworth (SW18)
Duration
7 months
Completed
2025
Overview
Structural steel installation removing load-bearing walls to open the ground floor plan. Sample case study set in Wandsworth (SW18).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Snagging & handover
- Party wall coordination
- Steelwork
- Plumbing & heating
- Tiling
- Bespoke kitchen install
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 7 months
Gallery

















Client feedback (illustrative)
“Communication was steady from first survey through to snagging.”
Illustrative feedback — SW18 structure (portfolio example, not a real client review)
Project area
Approximate area only — Wandsworth, SW18. No property addresses are published.
Related projects
All projects →
NW1Structural Steel · 2022
Camden Structural Steel
Structural steel installation removing load-bearing walls to open the ground floor plan. Sample case study set in Camden (NW1).
View project →
E15Structural Steel · 2021
Stratford Structural Steel
Structural steel installation removing load-bearing walls to open the ground floor plan. Sample case study set in Stratford (E15).
View project →
SE1Structural Steel · 2022
Bermondsey Structural Steel
Structural steel installation removing load-bearing walls to open the ground floor plan. Sample case study set in Bermondsey (SE1).
View project →